About distributed PV system

Policy guarantee

For distributed photovoltaic power generation according to the whole electricity subsidy policy, national feed-in tariff standard is 0.42 yuan per KWH...
For distributed photovoltaic power generation according to the whole electricity subsidy policy, national feed-in tariff standard is 0.42 yuan per KWH, on this basis, the developed local government subsidies. The implementation of national feed-in tariff and subsidy term in principle for 20 years. Encourage all kinds of power users in accordance with the "spontaneous for private use, allowance for Internet, grid to adjust" way of construction of distributed photovoltaic power generation systems

Pv subsidy policy summary all over the country

Photovoltaic (pv) is the country to develop the emerging industry, is also the clean renewable energy, in the era of advocating energy-saving, low carbon, environmental protection, much attention has been paid to the development of photovoltaic industry. In recent years, the country launched a series of policies to support the development of photovoltaic industry.

countries

In August 2013, the national development and reform commission issued "about play a role of price lever to promote the healthy development of photovoltaic industry notice (sent to change price [2013] 2013), clearly distributed photovoltaic power generation project subsidy standard is 0.42 yuan/kw (tax included).

provinces region Policy document
countries Send prices [2013] no. 2013

Photovoltaic power station:the country is divided into three kinds of solar energy resources, formulate corresponding photovoltaic power station a feed-in tariff, benchmarking zones I resource price 0.9 yuan/KWH, II class resources area price 0.95 yuan/KWH, class III resources in area a feed-in tariff 1.0 / KWH. Photovoltaic power station local coal-fired units higher than that of a feed-in tariff benchmarking benchmarking feed-in tariff (including desulfurization etc green electricity price, similarly hereinafter), through subsidies for renewable energy development fund. For distributed photovoltaic power generation is distributed photovoltaic (pv) : according to the whole electricity subsidy policy, feed-in tariff standard is 0.42 yuan per KWH (including taxes, similarly hereinafter), among them, of the power of distributed photovoltaic system than Internet access, the power grid enterprises shall, according to the local coal-fired units benchmarking a feed-in tariff

provinces region Policy document
Hebei Heibei [2013] no. 83

Of distributed photovoltaic roof project, carried out in accordance with the full power of another electricity price subsidies, subsidies standard is 0.2 yuan/KWH, by the provincial power grid companies settled in turn pay state subsidies. On October 1, 2015 to 2017 by the end of project completed and put into operation, 3 years from the date of interconnection subsidies. For more electric power by the provincial power grid enterprise online according to the local coal-fired units feed-in tariff clearing, benchmarking and benchmarking feed-in tariff adjustment accordingly.

Langfang Gallery policy [2014] no. 49

Distributed photovoltaic power generation to implement the national electricity subsidy policy, subsidy standards for 0.42 yuan per kilowatt hour.

provinces region Policy document Subsidies content
Shanghai Shanghai Shanghai hair change energy [2014] no. 2014 ShaSuitable for 2013-2015 were put to the city of new energy projects, reward on investment subject and award for five consecutive years. A single project annual bonus amount does not exceed 50 million yuan.

Photovoltaic power station: 0.3 yuan/KWH. Distributed photovoltaic (pv) : industrial and commercial users of 0.25 yuan/KWH, individuals, schools and so on to enjoy preferential tariff user is 0.4 yuan/KWH

provinces region Policy document Subsidies content
Zhejiang Zhejiang ZhengFa [2013】

Photovoltaic power generation project no. 49 capacity, the implementation according to the electricity subsidy policies, subsidies standards on the basis of the provisions of the state, province and subsidies to 0.1 yuan/KWH.

Hangzhou HangZheng letter [2014] no. 29

On the basis of the relevant national, provincial subsidies, according to its actual power by municipal finance subsidies to 0.1 yuan/KWH, the district or county (city) government subsidy is not lower than the municipal subsidies. Subsidies deadline is temporarily set at 2014-2015.

Hangzhou xiaoshan district Shaw ZhengBan hair [2013] no. 2013

Not included in the plan and buffet capacity not less than 30 kw of solar energy application project, according to the municipal power 0.2 yuan per kilowatt hour to give subsidies.

Roof owner use part of the photovoltaic power generation, guodian price is to give 15% discount.

Hangzhou fuyang  Fu zheng letter [2014] no. 58

According to the actual power generation effect after the completion of the project budget and annual support funds, confirmed, on the basis of the relevant national, provincial subsidies, after put into operation, the first two years, according to the standard of 0.3 yuan/KWH subsidies on project investment subject and the third to fifth years, according to the standard of 0.2 yuan/KWH subsidies.

For residential photovoltaic power generation project according to the installed capacity of 1 yuan/peak of one-time subsidies, not enjoy subsidies to generate electricity.

Hangzhou jiande    Jiande about print and distribute to speed up the several opinions of distributed photovoltaic application promotion

In addition to the relevant national, provincial subsidies is enjoyed by the policy, since the date of its power according to its actual power within three years by the municipal government subsidies. For enterprise use of 0.2 yuan/KWH, the king of 0.1 yuan/KWH.
For residential photovoltaic power generation project according to the installed capacity of 1 yuan/peak of one-time subsidies, no longer enjoy subsidies to generate electricity.

wenzhou Wen CaiQi [2014] no. 518

Build grid generation of photovoltaic power generation project at the end of 2014, 0.2 yuan per degree of subsidies for; Build grid-connected power generation at the end of 2015, 0.15 yuan per degree of subsidies for; Build grid-connected power generation at the end of 2016, to 0.1 yuan per degree of subsidies, subsidies for five years in a row.

Household photovoltaic roof project, from the date of acceptance of grid generation, 0.3 yuan per degree of subsidies, subsidies for five years in a row.

Roof owner from the date of acceptance of grid-connected power generation project, according to its capacity to 0.05 yuan per degree of subsidies, subsidies for five years in a row. Enterprise (residents) self-built model not fill.

Yongjia county, wenzhou city Yong ZhengFa [2013] no. 2013

Except the residential implementation in the scope of the county of installed capacity reached more than 50 kw of the photovoltaic power generation project, according to the actual power generation effect after the completion of the project, in addition to the relevant national, provincial, municipal subsidies is enjoyed by the policy, according to its power to give the project owners shall be registered in permanent subsidies, subsidies for five consecutive years from the date of the spontaneous electric, subsidy standard is 0.40 yuan per KWH subsidies.

Household roof installation of photovoltaic hair dia system, according to the capacity to RMB 0.3 per watt subsidy.

Wenzhou dongtou Hole ZhengBan hair [2014] no. 2014

For county range except local-style dwelling houses of installed capacity reached more than 50 kw of the photovoltaic power generation project, in addition to the relevant national, provincial subsidies is enjoyed by the policy, which all electricity (including spontaneous for private use and Internet power), 0.4 yuan per degree of subsidies, a fill five years; Which included in the outlying islands "tour photoelectric integration" is the project, in addition to 0.1 yuan per degree of reward.

Household roof installation of photovoltaic power generation system, according to the capacity to give 2 yuan per watt of one-time rewards; And according to 0.2 yuan per degree of subsidies for electricity generation, one for five years.

Released for committee of building roof rent for installation type of photovoltaic power generation system, according to the capacity to give roof all $0.05 per watt subsidy, word power fill five years from the date of enterprise (residents) self-built model does not fill.

Wenzhou ruian Rui ZhengFa [2013] no. 258

In addition to residential implementation in the scope of the county of installed capacity reached more than 50 kw photovoltaic power generation project, in addition to the relevant national, provincial, wenzhou is enjoyed by the policy subsidies, which all power electricity) (including spontaneous for private use and Internet access, 0.3 yuan per kilowatt-hour subsidies, for five years. To the release of the installation of photovoltaic (pv) power generation plant roof rent subsidies, according to its capacity to 0.05 yuan per degree of subsidies, word power fill five years from the date of enterprise (residents) self-built model does not fill.

Wenzhou yueqing city Le ZhengFa [2014] no. 29

Photovoltaic enterprise, registered in yueqing yueqing city region in the new distributed photovoltaic power projects,
According to the actual power generation effect after the completion of the project, in addition to the relevant national, provincial subsidies is enjoyed by the policy, according to its annual output to project construction operations enterprise 0.3 yuan (including tax) per kilowatt-hour of subsidies, subsidies for five consecutive years from the date of spontaneous electricity.

All through the roof installation of distributed power generation facilities that rent, according to its power to give owner roof 0.05 yuan (including tax) per kilowatt-hour of subsidies, subsidies for 5 consecutive years from the date of the spontaneous electric, enterprise (residents) self-built model projects do not enjoy the subsidies.

Jiaxing city Jia ZhengFa [2013] no. 87

Since the end of 2013 and 2013, the city at the corresponding level 200 megawatts of distributed photovoltaic power project subsidies, subsidies standards for $0.1 per KWH, subsidies for 3 years in a row.

In xiuzhou district of jiaxing city   Show chau ZhengFa [2013] 31

Listed in the state of distributed photovoltaic application demonstration area of photovoltaic power generation project, completed on schedule after connected to the grid, according to the capacity to give one-off subsidy of RMB 1 / (encourage prior purchasing the photovoltaic products, this product more than 30% of the investment of equipment and programs to give 100% allowance, below the 30% to 30% of the subsidies).

Jiaxing city haining HaiZheng do hair [2013] no. 260

Within the scope of implementation of photovoltaic power generation project of xiamen city, upon the approval of the declaration, the installed capacity of 0.1 mw above, on the basis of national and provincial financial subsidies, subsidies for pv electricity price place. For completion by the end of 2014 according to standard 0.35 yuan/KWH subsidies, subsidies for five consecutive years; Provider for roof resources according to the installed capacity of 0.3 yuan/watt one-time subsidies.

Tongxiang jiaxing city Tung classics XinChan [2013] no. 2013

For more than 0.1 megawatt demonstration project to 1.5 yuan/watt one-time subsidies, and put into production in the first two years according to 0.30 yuan/KWH subsidies, 3-5 years according to 0.20 yuan/KWH subsidies, the roof rental housing according to the actual use disposable 30 yuan/square meters. Sourcing pv products in the city, reward according to 15% of the purchase price.

Quzhou City Qu ZhengFa [2013] no. 53

In quzhou green industrial cluster areas to carry out the roof photovoltaic concentrated development pilot, tentatively, within five years of green purchasing local photovoltaic products industrial concentration zone construction of distributed photovoltaic power generation project, in the province on the basis of the fixed feed-in tariff 1.0 yuan/KWH, 0.3 yuan/KWH electricity price subsidies.

Quzhou City longyou Dragon ZhengFa [2013] no. 35

For photovoltaic electricity price subsidies, tentatively within five years, within the county of the construction of the photovoltaic power generation project, in the province on the basis of the fixed feed-in tariff 1.0 yuan/KWH, 0.3 yuan/KWH electricity price subsidies (has obtained national and provincial special funds of the project not fill).

To implement projects according to the capacity to give a one-off reward of RMB 0.3 per watt.

Quzhou City kaihua No formal document, for your reference

Construction of purchasing local photovoltaic products distributed in the county of above 1 mw photovoltaic power generation project, completed and put into operation, on the basis of the provincial electricity price subsidies, the county finance to 0.1 yuan/KWH feed-in tariff subsidy,

Quzhou City jiangshan city Jiang ZhengFa [2014] no. 2

Photovoltaic power station project construction according to the capacity to RMB 0.3 per watt of one-time subsidies; A feed-in tariff in national and provincial electricity subsidies on the basis of benchmarking, subsidies to 0.2 yuan/KWH.

Distributed photovoltaic power generation project construction according to the capacity to RMB 0.3 per watt of one-time subsidies; For spontaneous since the power consumption, on the basis of the national and provincial subsidies, subsidies to 0.15 yuan/KWH.

ningbo Ningbo yong ZhengFa [2014] no. 29

Before the end of 2015, included in the national, provincial and photovoltaic power generation projects have been put on file by provincial, municipal, and construction projects using the zhuhai enterprises in the production of pv modules, inverters, the project electricity subsidy on the basis of national, provincial electricity subsidy standards, from the date of grid-connected power generation project, the our city to give 0.10 yuan/KWH of te, fixed number of year of the subsidies 五5 years.

Deqing county, huzhou city Good do hair [2014] no. 2014

In addition to the relevant national, provincial subsidies is enjoyed by the policy, according to its annual output to 0.1 yuan/KWH of subsidies, as of the date of spontaneous electric, subsidies for three consecutive years. In industrial workshop, in case of distributed photovoltaic roof construction project, the roof of the first year in subsidies implementation of photovoltaic power generation project enterprise, two years after the subsidy photovoltaic enterprises. Families, residents have invested in the construction of photovoltaic power generation project, experience after receiving qualified, according to the capacity to give a one-time $2 per watt subsidy, highest do not exceed 10000 yuan, do not enjoy at the county level power reward.

Anji county, huzhou city Ann ZhengFa [2014] no. 18

For photovoltaic power generation project, implement according to the electricity subsidy policies, subsidies standards in national and provincial preferential policies, based on the county level to subsidies to 0.1 yuan/KWH, electricity, as of the date of subsidies for two consecutive years, has been enjoying national investment subsidies of photovoltaic power generation project is no longer subsidies. For enterprises and other units to install photovoltaic power generation and other new energy products, subsidies granted by 15 yuan/square meters standard.

shaoxing  Salt party hair [2013] no. 53

Registered enterprises in shaoxing investment and completed by the end of 2015 the new distributed photovoltaic grid-connected power generation project, according to the actual power of thought after the completion of the project, in addition to enjoy 0.42 yuan/KWH state according to the policy, 0.1 yuan/KWH subsidies. Spontaneous electrical according to its actual electricity generated by the project as of the date of the local government (ac) to give 0.2 yuan/KWH of subsidies, subsidies for period of five years.

Lishui city Li ZhengFa [2014] 27

Since the end of 2014 and 2014, the city at the corresponding level (including the lotus area, lishui economic development zone) is built of photovoltaic power generation project (including individual project) capacity, according to the electricity subsidy policy, subsidies standards set by the national, provincial, on the basis of subsidies to 0.15 yuan/KWH, electricity subsidies for 5 consecutive years as of the date of.

provinces region Policy document Subsidies content
Anhui Hefei  Zheng [2013] no. 2013

In addition to the relevant national, provincial subsidies is enjoyed by the policy, according to the annual output of project operation enterprise 0.25 / KWH subsidies; Entrust a specialized company management photovoltaic power station, according to the plant management in the management company 0.02 yuan/KWH of subsidies for electricity generation; Subsidies for 15 years in a row

Zheng [2014] no. 24

Family photovoltaic (pv) :the city within the scope of urban residents built grid family photovoltaic power station, according to the capacity of disposable 3 yuan per watt subsidy, a single plant subsidies for no more than 15000 yuan; Feidong, feixi county, changfeng county, lujiang county, chaohu regional grid photovoltaic power station, family farmers built once installed capacity $4 per watt subsidy, a single plant highest subsidy does not exceed 20000.

Distributed power station:based on enjoyed a municipal electricity subsidies, install the machine capacity power station once investors of 2 yuan/engineering subsidies, individual project subsidy does not exceed 1 million yuan.

Roof property owner:size more than 0.1 mw and built grid photovoltaic power station project, the roof of one-time give roof installation machine capacity property right person 10 yuan/mw rewards, individual projects reward does not exceed 600000 yuan, the same roof property right reward does not exceed 1 million yuan.

Bozhou city Bozhou city solar photovoltaic power generation measures for the management of special funds

Enterprises or resident new distributed solar photovoltaic power generation projects and in this city into the local state grid, power generating capacity according to the project, to 0.25 yuan/KWH fiscal subsidies, subsidies for 10 years.

provinces region Policy document Subsidies content
Guangdong Guangzhou city Guangdong special funds, solar photovoltaic power generation project construction management regulations (draft)

Resident individuals or units for project construction, according to the 0.1 yuan/KWH of logo, according to project one year capacity on the basis of calculating the amount of subsidies. Subsidies for 10 years in a row after project completed and put into operation.

For the ownership of buildings, based on the built projects with a total installed capacity, and determine the amount of subsidies by the standard of 0.2 yuan/watt, one-time extend to the building ownership. A single project maximum subsidy amount is 2 million yuan.

Foshan City Foshan distributed photovoltaic application project awards and subsidies money management regulations (draft)

The owner awards (one-time):2014-2015 of the construction of the use of commercial, schools, hospitals, residential community for the construction of buildings and other structures of distributed photovoltaic power generation project owner, support, according to 20000 yuan/mw a single project award is no more than 200000 yuan; In 2014-2015 individual households to provide their own area of buildings and other structures to install a single distributed photovoltaic power generation project size 4000 and above, 1 yuan per watt, a single project award is no more than 10000 yuan.

Investors reward:built in 2014-2015, in line with the subsidy scope of the project, according to the actual electricity subsidy 0.15 yuan/KWH, the distributed photovoltaic power generation project implementation connected to the grid of the month for three consecutive years.

provinces region Policy document Subsidies content
Jiangsu
Sue ZhengBan hair [2012] no. 2012

During the period of 2012-2015 the launch of the new state subsidies, photovoltaic power generation project implements the floor, roof, construction, integration, per KWH feed-in tariffs were identified as 1.3 yuan, 1.25 yuan in 2013, 2012, 2014, 1.2 yuan and 1.15 yuan in 2015.

Suzhou City Sue mansion [2015] no. 2015

According to the actual power generation effect after the completion of the project, in addition to enjoying national and provincial subsidies, in the project application unit or individual is 0.1 yuan/KWH.

Wuxi city Tin new tube hair [2013] no. 2013

Residents roof using local product of the distributed power generation project, in accordance with the standards of 2 yuan per watt subsidy.

Photovoltaic products localization rate more than 50% or more of the photovoltaic power generation project, in addition to enjoying national, provincial, municipal relevant subsidy policy, still can enjoy the district allowance according to the total installed capacity, a one-off subsidy of 200000 yuan/mw.

To use contract energy management mode of the photovoltaic power station project, the merit of implementation of contract energy management in the project units and the investment institutions, one-time give each project does not exceed 200000 yuan and 1 million yuan reward and project support.

provinces region Policy document Subsidies content
Jiangxi Jiangxi hair change energy word [2013] no. 2013

Initial investment subsidies, based on "m photovoltaic roof demonstration project", the residents of photovoltaic roof demonstration to enjoy the first phase of 4 yuan/watts, the second phase 3 yuan/installation fees of subsidies. 赣府厅字[2014]56号 Jiangxi province hall word [2014] no.56

Jiangxi province hall word [2014] no.56

To included in the province's annual construction projects (except m roof projects), to be built and through the acceptance, after enjoying national KWH subsidies, on the basis of 0.2 yuan per degree of electricity subsidies, subsidies for 20 years.

Nanchang City Hong FuTingFa [2014] no. 94

In the new photovoltaic power generation project of enterprises within the administrative jurisdiction of this municipality, in addition to the relevant national, provincial subsidies is enjoyed by the policy, then according to the included in the annual construction projects (except m roof projects), to be built and after passing the acceptance, according to the generating capacity to 0.15 yuan per kilowatt-hour subsidies, subsidies for temporary 5 years period.

provinces region Policy document Subsidies content
Shanxi Jin ZhengFa [2014] no. 4

2015 years ago, on photovoltaic power policy of VAT is carried back to 50%. For spontaneous since distributed photovoltaic power consumption, with free electricity price of all kinds of governmental fund and additional.

Taiyuan city And ZhengFa [2014] 26

To come and invest or expand the production scale of photovoltaic enterprise, priority arrange to provide land for land index and necessary supporting service facilities. To the actual completed investment in 50 million yuan, 50 million yuan - 100 million yuan and 100 million yuan of above, offer certain benefits or rewards of investment in fixed assets.

provinces region Policy document Subsidies content
Shaanxi Shaanxi province politics hair [2014] no. 37

In well implement national policy on the basis of the existing electricity price subsidies, the provincial financial fund according to the 1 yuan/standard, give a one-time investment subsidies

Shangluo Suggestions for accelerating the development of photovoltaic industry in shangluo

For registered in shangluo and full use of local enterprise production panels, components of power generation enterprises, in addition to enjoy the subsidies in the province, cities and counties in the financial press power to the ground again photovoltaic power station, and distributed photovoltaic power station allowance of 0.01 yuan and 0.05 yuan per degree.

provinces region Policy document Subsidies content
Hunan Hunan ZhengBan hair [2014] no. 2014

In 2014 and put into production of photovoltaic power station (including spontaneous for private use and Internet power) provincial subsidies to 0.2 yuan/degree, subsidies for 10 years. Changes in the cost of production project in 2015-2017, according to timely adjust.

provinces region Policy document Subsidies content
Hubei Huangshi city Huangshi about supported the idea of light wind power industry development

Construction of distributed photovoltaic electricity prices, our city in the country, on the basis of subsidies to 0.42 yuan per kilowatt-hour, subsidies to 0.1 yuan. Building photovoltaic power station generating electricity, according to the relevant provisions of the state, the approval of the competent department in charge of prices, on the basis of a feed-in tariff, subsidies to 0.1 yuan, subsidies time for 10 years.

provinces region Policy document Subsidies content
Henan The city of luoyang Los administration [2013] no. 2013

Built at the end of 2015 or connected to the grid, and the priority use of zhuhai companies in the production of the components of distributed photovoltaic power projects, the examination and approval, in addition to the relative national and provincial preferential policies according to the policy, according to its capacity to give reward to 0.1 yuan/watt operating enterprise, reward for 3 years in a row.

provinces region Policy document Subsidies content
Jilin Send prices [2013] no. 2013

Photovoltaic power generation project, implement according to the electricity subsidy policy, subsidies standards on the basis of the provisions of the state, province and subsidies to 0.15 yuan/KWH.

provinces region Policy document Subsidies content
Shandong Lu ZhengFa [2014] no. 16

In 2013-2015, into the state's annual guide distributed photovoltaic electrical project of the hair, the hair all power in 0.42 yuan per KWH subsidies to the standards set by the state, based on the provincial level to give 0.05 yuan per KWH of electricity price subsidies.

Return on investment   Policy subsidies + sales revenue

Policy subsidies + sales revenue Industrial and commercial users Return: 15-20% Cost recovery period: 4 to 6 years The service life of the product: 25 years Cost recovery period: 8-10 years
Industrial and commercial users Residents of the user
Return: 15-20% Return: 8-12%
Cost recovery period: 4 to 6 years Cost recovery period: 8-10 years
The service life of the product: 25 years The service life of the product: 25 years年

Parity electricity

Implementation of time-sharing electricity price policy in our country, according to the peak...
Implementation of time-sharing electricity price policy in our country, according to the peak, flat and valley time electricity pricing. Electricity prices overall it "are gradually rising trend." After the installation of distributed photovoltaic power generation systems, without having to worry about the future price increases.

Ease power brownouts

Due to high-speed economic growth, industrial electricity consumption continues to rise. In order to further do a good job in saving energy and reducing consumption ...
Due to high-speed economic growth, industrial electricity consumption continues to rise. In order to further do a good job in saving energy and reducing consumption part of provinces and cities of high energy consumption enterprises have adopted the policy of electricity, to control the total quantity of the electricity. After the installation of distributed photovoltaic power generation systems, and can effectively ease the problem of shortage of electric power.

Environmental emissions

1 mw distributed photovoltaic (pv) grid power generation system, the average cumulative power generation 25 years up to 25 million degrees, is quite equal to ...
1 mw distributed photovoltaic (pv) grid power generation system, the average cumulative power generation 25 years up to 25 million degrees, is quite equal to 5250 tons of standard coal saving, emission reduction dioxide 24925 tons, 6800 tons of dust to reduce carbon emissions